- Home
- General Information
- Procurement (Tender Opportunities)
- REQUEST FOR PROPOSAL (RFP) ON DESIGN AND BUILD FOR THOMSON FERTILITY CENTRE (TFC) AND CHINESE MEDICINE CLINIC (TCM) AT UNITED SQUARE #01-18 TO 28
REQUEST FOR PROPOSAL (RFP) ON DESIGN AND BUILD FOR THOMSON FERTILITY CENTRE (TFC) AND CHINESE MEDICINE CLINIC (TCM) AT UNITED SQUARE #01-18 TO 28
TMC-FM-USRENOTCMTFC-2001251)Tenderer shall possess the registration with BCA:
CW01 General Building: BCA Financial Grade minimum C3 & above or,
CR06 Interior Decoration, & Finishing Works: BCA Financial Grade minimum L1 & above
2) Tenderer or tenderer's sub-contractor shall possess the registration with BCA:
i) ME01 - Air-conditioning, Refrigeration & Ventilation Works: BCA Financial Grade minimum L1 & above
ii) ME06 - Fire Prevention & Protection Systems: BCA Financial Grade minimum L1 & above
iii) ME12 - Plumbing & Sanitary Work: BCA Financial Grade minimum L1 & above
3)Tenderer must attend compulsory briefing / site show onsite location
4)Tenderer shall not be penalized with more than 10 demerit points basing on MOM Demerit Point System published record
5)ISO certification/Bizsafe
- Provide full company Profile with Company’s Organization Chart
- Provide a list of past and current projects that your company are involved, with indicative contractual value (estimated range) Information provided will be kept strictly confidential which will be reviewed and evaluated.
- Past 3-years audited financial statement.
PLEASE NOTE THAT THE EMPLOYER MAY IMPOSE A LIQUIDATED DAMAGES OF S$500.00 PER DAY UP TO THE AWARDED CONTRACT SUM SHOULD THE UNITS NOT COMPLETED AND HAND OVER AS ACCORDING TO THE STRIPULATED TIMELINE
- Performance bond: 10% of the awarded contract sum, in the form of an approved banker's guarantee or insurance bond.
- Limit of retention: 5% of the contract sum
[Note: 1st release of retention sum (2.5% of contract sum) will be release upon issuance of Completion Certificate]
[Note: 2nd release of retention sum (2.5% of contract sum) will be release upon issuance of Maintenance Certificate]
- Form of contract: REDAS DESIGN & BUILD CONDITIONS OF MAIN CONTRACT - 4 TH EDITION
- Type of Contract: Lump Sum Contract